To the central content area

The Operation Performance Test of Phase II Vacuum Assist Vapor Recovery System in Gasoline Stations

Absrtact
(1)To execute the random check on the equipment efficiency test of Phase II vapor recovery facility from 200 Gasoline stations: The average qualified rate is 69% for gasoline nozzle samples. As to the test result of Air Leak check, there are 47 out of total 52 stations qualified for this check. The qualified rate is 94%. Inspecting the reason of disqualification, 25% of the failure results from the plugged vapor path by residual gasoline in the hoses, then 17% from motor power deficiency and 13% from motor failure. After the improvement measurement of the failure facilities are recommended and conducted by 50 stations’ assistance. The average qualified rate of gasoline nozzle samples is increased from 25% to 98%. The total reduced volume is 203 tons/year after these 200 stations’ assistance. The Alliance of Reducing Gasoline Stations’ Vapor Emissions arranged 11 Coordination Meetings for participants to understand more about government policies. All proposed issues and suggestions will be put into the important reference for the later amend on the public regulations and managements. (2) The related propaganda of this subject matter There are 10 Vapor Recovery Policy Guidance and Training Courses held for 312 stations/333 attendees. These courses even had the demonstration on site leak check training and trouble shooting. The main educated objects were taxi drivers who were guided by several public media channels such as leaflets, posters, Police Radio Station on Traffic Network for this topic. (3)To assist public section to implement Gasoline Vapor Recovery Control Policy For this part, it is expect to collect related regulations and working experience from foreign countries that have implemented the vapor recovery control policy and regulated the control policies for punishment. In addition to this, it will plan and prepare the guidance and documentation for TEPA to implement vapor recovery policy and the related measures in working schedule.
Keyword
vapor recovery policy guidance training courses,Phase II vapor recovery system,Air to Liquid Ratio(A/L) test,VOC emissions,,
Open
top